怎样做卫生间防水

 文章来源:http://www.jnldfs.com/ 发布时间:2022-06-02   

尤其是在这个炎热的夏天,我们几乎每天都要去卫生间。如果卫生间不防水,整天潮湿,就够烦的了。大人不要紧,如果家里有老人小孩,就要注意了!大家在装修卫生间的时候要格外小心,河南防水工程告诉你尤其是卫生间的防水施工。不仅是装修材料的选择,工人师傅的施工也要注意。门槛、地砖铺设、搓板等地方都要注意!那么卫生间怎么做防水呢?
Especially in this hot summer, we have to go to the bathroom almost every day. If the bathroom is not waterproof and it is wet all day, it will be annoying enough. Adults don't matter. If there are old people and children at home, you should pay attention! You should be extra careful when decorating the bathroom. Henan waterproof project tells you, especially the waterproof construction of the bathroom. It is not only the choice of decoration materials, but also the construction of workers and masters. Pay attention to the threshold, floor tile laying, washboard and other places! So how to make the bathroom waterproof? 
(1)防水前一定要平整地面,防止厚薄不均损坏防水材料。
(1) Before waterproofing, the ground must be leveled to prevent uneven thickness from damaging the waterproof materials.
(2)防水涂料的选择:一种是合成高分子3354聚氨酯防水涂料(聚酯布、玻璃纤维布等。对于拐角是的)。另一种是——SBS聚合物改性沥青防水涂料(聚酯布、玻璃纤维布等)。
(2) Selection of waterproof coating: one is synthetic polymer 3354 polyurethane waterproof coating (polyester cloth, glass fiber cloth, etc. for corners). The other is SBS polymer modified asphalt waterproof coating (polyester cloth, glass fiber cloth, etc.).
(3)刷遍防水涂料。防水公司建议,施工前,确保施工现场清洁干燥,防水涂料涂刷饱满无遗漏,与基层结合牢固无裂缝、气泡、脱落。涂层高度应一致,厚度应满足产品要求。
(3) Apply waterproof coating. The waterproof company suggests that before construction, ensure that the construction site is clean and dry, that the waterproof coating is fully applied without omission, and that it is firmly combined with the base without cracks, bubbles and falling off. The coating height shall be consistent and the thickness shall meet the product requirements.
(4)刷二遍防水涂料。防水公司提醒,注意首遍和二遍防水涂料之间需要一定的时间间隔,二遍只能在遍涂料完全干燥后进行,具体时间视涂料而定。间隔过短,防水效果会大打折扣。
(4) Brush two coats of waterproof paint. The waterproof company reminds that a certain time interval is required between the first and second coats of waterproof coating. The second coat can only be carried out after the first coat of coating is completely dry. The specific time depends on the coating. If the interval is too short, the waterproof effect will be greatly reduced.
(5)铺设保护层。防水公司提醒,为防止后续施工破坏防水层,应在防水涂料表面铺设保护层。保护层应完全覆盖防水层,无遗漏,与基层结合牢固,无裂缝、气泡和脱落。
(5) Lay protective layer. The waterproof company reminds that in order to prevent subsequent construction from damaging the waterproof layer, a protective layer shall be laid on the surface of the waterproof coating. The protective layer shall completely cover the waterproof layer without omission, and shall be firmly combined with the base layer without cracks, bubbles and falling off.
(6)闭水试验。防水公司提醒,闭水试验时,地面高点的积水不得少于2厘米,并至少保持24小时。观察无渗漏才算合格。有漏的再做一遍,不要疏忽。
(6) Closed water test. The waterproof company reminds that during the closed water test, the accumulated water at the high point of the ground shall not be less than 2 cm, and shall be maintained for at least 24 hours. It is qualified only when there is no leakage. Do it again if there is any omission. Don't be careless.
(7)基层处理、清理、找平层、粘结层、细部附加层、丙烯酸防水层、蓄水试验、保护层施工、二次蓄水试验。
(7) Base course treatment, cleaning, leveling layer, bonding layer, detail additional layer, acrylic waterproof layer, water storage test, protective layer construction, secondary water storage test.
2.墙面
2. wall surface
(1)河南防水工程告诉你防水前,要提前湿润墙面。可以用滚筒顺着墙面刷水,注意不要太湿。
(1) Henan waterproofing project tells you to wet the wall in advance before waterproofing. You can use a roller to brush water along the wall. Be careful not to be too wet.
(2)然后,按防水材料混合。水泥基胶水或组分防水材料直接配比,搅拌均匀。
(2) Then, mix as waterproof material. Cement based glue or component waterproof materials shall be mixed directly and evenly.
(3)墙面清水消失后,开始用滚筒沿一定方向刷拌好的防水涂料;每次按压前先刷1/4的面积,避免出现空隙。另外,靠近管口和预留孔处,用刷柄仔细刷。
(3) After the clean water on the wall disappears, start to brush the mixed waterproof coating along a certain direction with a roller; Brush 1/4 of the area before each press to avoid gaps. In addition, close to the pipe orifice and the reserved hole, carefully brush with the brush handle.
(4)首遍刷完后,静置晾干(约4-6小时)。另外,一般情况下,淋浴间墙面防水要1.8米高,洗脸盆1米高,卫生间墙面离地30CM。
(4) After the first brush, leave it to dry (about 4-6 hours). In addition, under normal circumstances, the water-proof wall of shower room shall be 1.8m high, the washbasin shall be 1m high, and the wall of toilet shall be 30cm above the ground.
(5)还有,重新调配防水材料,垂直于道防水涂膜方向进行二道防水施工。完工后晾干,24小时后即可贴瓷砖。
(5) In addition, the waterproof materials shall be redeployed, and the second waterproof construction shall be carried out perpendicular to the direction of the first waterproof coating. Air dry after completion, and tile can be pasted after 24 hours.
以上就是为大家介绍的有关济南楼顶防水http://www.jnldfs.com的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以专业的态度,为您提供服务.
The above is about Jinan roof waterproofing http://www.jnldfs.com I hope it will be helpful to you If you have any questions, please contact us We will provide you with professional service
服务项目 / Recommended news
  • 外墙保温工程
    外墙保温工程
  • 济南外墙保温工程
    济南外墙保温工程
  • 外墙保温工程
    外墙保温工程
  • 济南外墙保温工程公司
    济南外墙保温工程公司
  • 外墙保温工程
    外墙保温工程
  • 济南外墙保温工程
    济南外墙保温工程
  • 外墙保温工程
    外墙保温工程
  • 卫生间防水
    卫生间防水
  • 济南卫生间防水
    济南卫生间防水
  • 卫生间防水
    卫生间防水
  • 卫生间防水
    卫生间防水
  • 卫生间防水公司
    卫生间防水公司
  • 卫生间防水
    卫生间防水
  • 卫生间防水
    卫生间防水
  • 楼顶防水
    楼顶防水
  • 济南防水公司
    济南防水公司
  • 济南楼顶防水
    济南楼顶防水
  • 楼顶防水
    楼顶防水
  • 济南屋面防水
    济南屋面防水
  • 楼顶防水
    楼顶防水
联系我们
/Contact us
济南天桥区魏氏防水工程队
济南天桥区魏氏防水工程队

客户咨询热线

0531-58663452

服务电话:13665318269

联系人:魏经理

公司网址:http://www.jnldfs.com/

联系地址:天桥北园水屯路118号